13755 Sunrise Valley Drive Suite 230 Herndon, VA 20171
Monday to Saturday 8 AM to 5 PM (EST)
state-of-the-art below-cost technology
Cost-competitive across geographies
Sustainable speed of construction through simplified construction processes to provide labor as needed
Rigorous quality control by construction stages & phases
Scalability (Rapid Expansion)
Respond to different constraints related to land availability, local terrain, consumer requirements
GFS Housing has partnered with Precise Forms which is the leader in the concrete form manufacturing. We use Precise Form’s forming systems for shelters, homes, and subdivisions which is of highest quality.
For more information about Precise Forms construction, please visit their website www.preciseforms.com
Pre-engineered metal building systems are being used in any industry or application, including commercial, industrial, standing seam, architectural, municipal, residential, and aeronautical buildings. Onsite factory can be erected very quickly to reduce the transportation costs.
Pre-cast concrete in a re-usable mold or "form" which is then cured in a controlled environment, transported to the construction site and lifted into place. Alternatively the factory can be set up at the site.
Lost-in-place Formwork using recycled polycarbonate modules. Applications include high-rise and low-rise building in the residential, commercial and industrial plural sectors.